1972 Chevelle Malibu Restoration Timeline
"Putting it all back together"
Date 4-25-09

Wow, what a day Saturday April 25th was. We went from a car body sitting on a body cart to a almost complete body in about 6 hours. Encountered a couple of headaches on the way but nothing we couldn't overcome. Granted most of the work was done by Justin Newpower a Jaguar, Range Rover and now Chevelle Specialist in Phoenix Arizona, but I did lend a helping hand where I could. I also provided the lunch and beer which I drank and ate most of! We put it all back together to make sure everything fit and to get the gaps right. Next plan is to rip it all apart one more time to paint.







Electric Fuel Pump







Website templates

Home
In The Beginning
Front Clip
Engine Pull
Interior
Body Lift
Media Blast
Powder coat
Suspension
Engine
Exhaust
Sheet Metal 1
Sheet Metal 2
Bodywork
Putting it back together
Paint
Contact